Addressed a few issues this week including the stairs, they appeared to be too narrow despite the fact they are the standard width of 42" wide. Consequently we removed them, shifted some walls and made the stairs 47" wide, a huge difference.
The wind and rain were a problem this week, the hoarding we installed on the back deck was torn apart the day we attempted to lay the vinyl decking so we had to reschedule for next week. The supply and drain lines for all of the plumbing are completed, the master shower is in place and the main bath tub/shower is also in place. The entire heating system is in place and all of the heat ducts and cold air returns have been sealed to prevent construction debris from entering the system.